King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

Location Waad Al-Shamal

Type EPC

Sector Water

Status Completed

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

We also built booster pumping stations at Arar, three water-acquisition system (WAS) booster stations, and the Turaif Water Treatment Plant pumping station. This turnkey EPC scope ensures a reliable, high-capacity flow of treated water from Arar to the new city of Waad Al-Shamal.

pro-btm

Related Projects